Showing posts with label kcicon. Show all posts
Showing posts with label kcicon. Show all posts
Friday, July 27, 2012
One Eye on the Cash, the Other on the Clock
Earlier in July, we learned that MoDOT earned top honors in the Mid-America Regional “America’s Transportation Awards” competition for two projects.
The first, kcICON, won as the large project in the "Ahead of Schedule" category. In addition to widening about five miles of Interstate 29/35 and rebuilding five interchanges, the Kansas City project included the new signature cable-stayed Christopher S. Bond Bridge across the Missouri River.
Construction began in April 2008 and – even with all of that work – was completed in December 2010, more than six months ahead of schedule.
On the other side of Missouri, the St. Louis area’s I-270 Dorsett-Page Project won as the medium project in the “Under Budget” category. Three projects were rolled into one, giant, congestion-relieving undertaking.
It was completed for $2.4 million less than the original $34.8 million budget – and was opened a month ahead of time to boot!
How does this happen? MoDOT and its contracting partners pay very close attention to detail and work as partners through the design and construction phases.
Communities also deserve credit for providing feedback during planning stages and for motorists’ patience and attentive driving during construction.
Working together, MoDOT, contractors and the people of Missouri are able to obtain maximum value from limited transportation dollars.
How do we compare to other states? We’ll get some indication in November when these winning projects compete with those from other regions for national honors at the American Association of State Highway and Transportation Officials’ annual meeting.
There’s likely to be a People’s Choice component to the competition, so look for your chance to vote soon!
Wednesday, July 6, 2011
Light Up the Sky
The new Christopher S. Bond Bridge in Kansas City took on a whole new light on July 3, and it became a real blast.
The bridge features a unique lighting system with a series of interconnected color-changing panels - 106 of them - able to display thousands of colors in a variety of patterns. There are nine lighting packages that can be used throughout the year to reflect the city's seasons, holiday and regional events.
The inaugural lighting debut kicked off just minutes before the fireworks extravaganza celebrating KCRiverFest over the Fourth of July holiday.
Don't miss the rest of these photos on Flickr!
The bridge features a unique lighting system with a series of interconnected color-changing panels - 106 of them - able to display thousands of colors in a variety of patterns. There are nine lighting packages that can be used throughout the year to reflect the city's seasons, holiday and regional events.
The inaugural lighting debut kicked off just minutes before the fireworks extravaganza celebrating KCRiverFest over the Fourth of July holiday.
Don't miss the rest of these photos on Flickr!
Labels:
bond bridge,
bridge,
bridges,
Kansas City,
kcicon,
missouri department of transportation,
modot
Friday, December 31, 2010
Signs of Progress
The end of a year just isn't the same without a little reflection on the year's accomplishments. For 2010, MoDOT had some big ones. Customer satisfaction and trust are high, billions of pounds of waste have been recycled, kcICON opened early and was selected as a top road project, and the number of fatalities on Missouri roads continue to decline. Watch below to learn about 2010's top ten signs of progress for Missouri transportation.
Thursday, October 14, 2010
At the Top
Congratulations to those working with the kcICON Project in Kansas City, selected as the top road project and the fifth best bridge project of 2010 by Roads and Bridges magazine! Check the photos of the ribbon-cutting event last month. For a view from the top, don't miss the Shaky Cam video at http://bit.ly/am7fIU.
Friday, July 2, 2010
Massive Concrete Girders are a Missouri First
The single-longest, precast, concrete bridge girders in Missouri state history were installed this week on MoDOT's kcICON design-build project. The 150-foot girders are part of a new land bridge that will span northbound Interstate 29/35 and carry southbound Interstate 29/35 traffic headed for The Paseo, Independence Avenue, and points beyond.
"Imagine a single, I-shaped piece of concrete that stretches from a football field's end zone to the 50-yard line," said kcICON Project Director Brian Kidwell. "Moving just one of these 150,000 pound girders is like lifting the equivalent weight of 70 classic Volkswagen Beetles."
Learn more about the girders from MoDOT Engineer Tom Skinner in this podcast.
Visit the project Web site at http://www.kcicon.com/ or find them on facebook by searching "kcICON project."
"Imagine a single, I-shaped piece of concrete that stretches from a football field's end zone to the 50-yard line," said kcICON Project Director Brian Kidwell. "Moving just one of these 150,000 pound girders is like lifting the equivalent weight of 70 classic Volkswagen Beetles."
Learn more about the girders from MoDOT Engineer Tom Skinner in this podcast.
Visit the project Web site at http://www.kcicon.com/ or find them on facebook by searching "kcICON project."
Sunday, June 13, 2010
Championing Workforce Diversity
kcICON Project team member Jontell Jones was bestowed the 2010 Rosa Parks Award at the Metro Organization for Racial and Economic Equity’s fifth annual Imagine Banquet held June 10 at the Hyatt Regency Crown Center.
MORE2’s Rosa Parks Award is given to individuals or companies who exemplify the courage to stay the course and change the inequity in the metro area.
Just over two years ago, Jones, 28, with two children, was working construction jobs that paid cash and provided no benefits. Jones was then hired by Paseo Corridor Constructors to participate in the On-the-Job Trainee Program offered through kcICON Project.
MoDOT provides up to $1.25 million for kcICON Project workforce training. This training is designed to create opportunities that will grow a more diverse workforce in the Kansas City region and to increase the number of minority, female and economically disadvantaged individuals working across the state of Missouri. There are currently 35 On-the-Job Trainees employed on the kcICON Project. Jones is one of 14 individuals to date who have graduated from the program.
Jones, now a Quality Assurance Technician, has completed over 2,000 hours of training in heavy highway construction. During his acceptance speech, Jones said, “It feels good to go from having a job to having a career.”
Jones thanked MORE2, MoDOT and the supervisors and co-workers at Paseo Corridor Constructors who have guided him through the training process. “I am grateful for the support I have received on the project, and grateful to be able to represent others, like myself, in the community who can excel if given the chance.”
The $245 million kcICON project will reconstruct/rehabilitate 4.7 miles of Interstate 29/35 from just north of Route 210/Armour Road in North Kansas City into the northeast corner of the downtown Kansas City, Mo. freeway loop. The project includes improving outdated interchanges and the construction of the Christopher S. Bond Bridge – a new landmark, cable-stay Missouri River Bridge. Additional information is available on the project’s Web site: www.kcicon.com or on Facebook “kcICON Project.”
MORE2’s Rosa Parks Award is given to individuals or companies who exemplify the courage to stay the course and change the inequity in the metro area.
Just over two years ago, Jones, 28, with two children, was working construction jobs that paid cash and provided no benefits. Jones was then hired by Paseo Corridor Constructors to participate in the On-the-Job Trainee Program offered through kcICON Project.
MoDOT provides up to $1.25 million for kcICON Project workforce training. This training is designed to create opportunities that will grow a more diverse workforce in the Kansas City region and to increase the number of minority, female and economically disadvantaged individuals working across the state of Missouri. There are currently 35 On-the-Job Trainees employed on the kcICON Project. Jones is one of 14 individuals to date who have graduated from the program.
Jones, now a Quality Assurance Technician, has completed over 2,000 hours of training in heavy highway construction. During his acceptance speech, Jones said, “It feels good to go from having a job to having a career.”
Jones thanked MORE2, MoDOT and the supervisors and co-workers at Paseo Corridor Constructors who have guided him through the training process. “I am grateful for the support I have received on the project, and grateful to be able to represent others, like myself, in the community who can excel if given the chance.”
The $245 million kcICON project will reconstruct/rehabilitate 4.7 miles of Interstate 29/35 from just north of Route 210/Armour Road in North Kansas City into the northeast corner of the downtown Kansas City, Mo. freeway loop. The project includes improving outdated interchanges and the construction of the Christopher S. Bond Bridge – a new landmark, cable-stay Missouri River Bridge. Additional information is available on the project’s Web site: www.kcicon.com or on Facebook “kcICON Project.”
Wednesday, April 14, 2010
One Million and Counting...
Kansas City's Interstate 29/35 Bond Bridge Project On Time, On Budget
MoDOT Director Pete Rahn joined the kcIcon Project Community Advisory Group, Workforce Development Committee members, and the Paseo Corridor Constructors contractor team to speak last week about the fantastic record of the kcICON project.
One million design and construction man-hours have been logged to date.
The iconic 316-foot center pylon is complete, with eight of its 40 stay cables already in place. Another cool feature of this project coming up is a continuous 134-foot-wide bridge deck concrete pour -- that's the single widest in the history of MoDOT projects!
The kcICON project has supported jobs and economic growth for the city. Seventy minority, female and economically disadvantaged On-The-Job Trainees have contributed about 63,000 hours to the project, gaining valuable training for long-term careers in construction.
The $245 million project is 67 percent complete, keeping it on schedule for completion by July of next year. Check http://www.kcicon.com/ to keep up with the latest on this project. Add it as a favorite - you won't want to miss out on the many interesting features of this project.
Tuesday, March 2, 2010
Missouri Miles
Many people may not realize how much transportation really affects them. More than just road work or your daily commute, transportation affects how you live, work and play each day in Missouri.
To show you the scenes behind those orange cones, MoDOT has started a video series to keep you up-to-date on everything Missouri. We take you along Missouri Miles to show you construction projects in your area, provide tips on safe travel and show some unique perspectives of how transportation affects you. With our pilot show, you even get a chance to take a road trip to Bennet Springs for a little winter fishing.
Travel Missouri Miles each month by visiting www.modot.org/modotvideos or through our YouTube channel. Let us know what you think, and what you might like to see covered on a later show.
To show you the scenes behind those orange cones, MoDOT has started a video series to keep you up-to-date on everything Missouri. We take you along Missouri Miles to show you construction projects in your area, provide tips on safe travel and show some unique perspectives of how transportation affects you. With our pilot show, you even get a chance to take a road trip to Bennet Springs for a little winter fishing.
Travel Missouri Miles each month by visiting www.modot.org/modotvideos or through our YouTube channel. Let us know what you think, and what you might like to see covered on a later show.
Labels:
Kansas City,
kcicon,
missouri,
missouri department of transportation,
Missouri Miles,
modot,
www.modot.org
Friday, January 29, 2010
Tall, Orange and Handsome
Hold onto that steering wheel.
This week, a tall, orange and handsome stranger arrived in Kansas City. Known as Barrel Bob, he began his job this week as a fixture on the kcICON Project, reminding motorists to slow down and take it easy in a work zone.
Barrel Bob won't be a stranger for long -- he has a debut appearance in a PSA about driving safely in the kcICON Corridor. Don't miss it.
Who's behind those barrels? He's the creation of Robert Ohl, a Clarkson Construction employee. Barrel Bob took about 10 hours to build and comes in standard safety gear.
This week, a tall, orange and handsome stranger arrived in Kansas City. Known as Barrel Bob, he began his job this week as a fixture on the kcICON Project, reminding motorists to slow down and take it easy in a work zone.
Barrel Bob won't be a stranger for long -- he has a debut appearance in a PSA about driving safely in the kcICON Corridor. Don't miss it.
Who's behind those barrels? He's the creation of Robert Ohl, a Clarkson Construction employee. Barrel Bob took about 10 hours to build and comes in standard safety gear.
Labels:
Kansas City,
kcicon,
road work,
work zone safety
Subscribe to:
Posts (Atom)





